Always Free Shipping
Get 8% Discount On All LED Fixtures Code:

What Are Your Metal Building Lead Times?

For our metal structures, the time frame is roughly 6-8 weeks AFTER the foundation is ready. Once the deposit is paid, the order is sent into scheduling.  Once the foundation is ready, the scheduling department will contact you for a scheduled installation date.

Leave a Reply

Your email address will not be published. Required fields are marked *

Ready To Design A Building?

Let Us Help.